Work zones we’ve run

Utility, site, roadway and event traffic control across Middle Tennessee. Here’s a look at the kinds of jobs our crews handle.

Line of channelizing cones closing a lane at night on a Midtown Nashville street with the skyline behind
TTC

Water line tie‑in at Raising Cane’s

Where
Broadway & 19th Ave S, Nashville
Client
Embree Construction
Duration
About 2 weeks

Night lane closures with channelizing cones on one of Midtown’s busiest corridors, keeping Broadway traffic moving around a water line tie-in.

Aerial view of a cone line, water-filled barriers and a Utility Work Ahead sign around underground storm water repairs at a McDonald's drive-thru in Shelbyville, TN
TTC

Storm water repairs at McDonald’s

Where
Shelbyville
Client
Hudson Company
Duration
About 1 week

Cones, water-filled barriers and advance signs kept customers moving through the drive-thru while crews repaired the underground storm water system in an active restaurant lot.

Night lane closure on Gallatin Pike in Madison, TN with a lane-reduction sign, lit arrow board and channelizing cones
TTC

Sewer tie‑in at In‑N‑Out

Where
Gallatin Pike, Madison (Rivergate)
Client
Candito Construction
Duration
About 3 weeks

A lane-reduction taper, arrow board and channelizing cones kept Gallatin Pike moving while crews ran a sewer tie-in across one of Madison’s busiest roads.

Lane closure with cones and an arrow board on a multi-lane East Nashville road during storm box repairs
TTC

Storm box repairs at Whataburger

Where
East Nashville
Client
The Clayton Group
Duration
2 days

A lane closure with cones and an arrow board on a busy East Nashville corridor, giving the crew room to repair a storm box while traffic kept moving.

Your photo: Municipal repair work zone
TTCSample

Storm drain repair for a city

Where
Robertson County
Road
Residential collector
Duration
4 days

Full traffic control for a public works repair, from plan to pickup, so city crews could focus on the pipe.

Your photo: Message board on long-term job
MOTSample

Commercial site entrance

Where
Williamson County
Road
Four-lane divided
Duration
2 months

Long-term shoulder and lane closure with scheduled inspections and phase changes.

Placeholder: a quote from an event organizer or city contact about a closure or event that went smoothly.
Name, Title · Organization

ATSSA certified

Traffic Control Supervisors, a Design Specialist and Certified Flaggers on our team.

Fully insured

Certificates of insurance sent on request, naming you as additional insured when required.

Permit experience

City, county and Tennessee Department of Transportation (TDOT) permitted work, with plans drawn in house.

Our own equipment

Cones, signs, arrow boards and message boards owned and maintained by TTC.